Dana Court Wash Bay Construction

We are proud to be involved in the design and construction of a state-of-the-art wash bay facility for the Fulton Hogan Asphalt Plant in Dandenong. This new facility addresses the limitations of the previous wash bay, focusing on efficient truck cleaning and effective waste management to ensure compliance with environmental regulations. The facility is equipped with advanced water recycling systems that divert wastewater to the trade waste sewer line, significantly reducing environmental impact and promoting sustainability.

By enhancing the fleet maintenance process, this wash bay will not only improve operational efficiency but also demonstrate Fulton Hogan’s commitment to responsible environmental practices

Project Description

Location:

Dandenong, Victoria (Fulton Hogan Asphalt Plant)

Description:

– Excavation and Earthworks: Carrying out site excavation and necessary earthworks to prepare the area for construction.

– Concrete Structure Construction: Building concrete structures in line with project specifications, ensuring structural stability and durability.

– Design Delegation: Reviewing and delegating design responsibilities to ensure compliance with engineering standards and project requirements.

– Concrete Foundation for Canopy: Constructing a reinforced concrete foundation to support the canopy structure, ensuring proper load distribution and stability.

Client:

Fulton Hogan

Work Categories:

Concrete Structures