SEW Sewer Pump Station Track Upgrade

Laneway 203, Mitcham Brick Works
November 7, 2024
Melbourne Water Crack Repair Project
November 7, 2024
Laneway 203, Mitcham Brick Works
November 7, 2024
Melbourne Water Crack Repair Project
November 7, 2024

SEW Sewwer Pump Station Track Upgrade

We are currently engaged in the SEW Sewer Pump Station Track Upgrade, a crucial project aimed at enhancing access to the pump station located in a steep, unsealed gravel area. This track has faced significant challenges during heavy rainfall, as the gravel gets washed away, making it difficult for maintenance vehicles to safely access the facility. Our upgrade will ensure reliable year-round access, which is vital for the operation and maintenance of the asset.

Project Description

Location:

Mornington

Description:

– Tree Management: Responsible handling of existing trees within the project site, including necessary preservation, relocation, or removal as required.

– Asset Condition Recording: Documentation and recording of the condition of nearby existing services to avoid damage and ensure continuity of service.

– Excavation and Bulk Earthworks: Excavation and earthmoving to prepare the site for construction, managing site grading, and soil relocation as necessary.

– Concrete Works: Installation of 250 m² of concrete surfaces, including foundations, walkways, or slabs as specified in project requirements.

– Adjustment of Existing Cover Levels: Modification of lid and cover levels to ensure alignment with new surface grades and accessibility.

– Retaining Wall Construction: Building of a retaining wall to manage soil stability and prevent erosion, based on site grading needs.

– Sewer Pump Station Risk Assessment & Mitigation: Identification of potential risks associated with the sewer pump station and implementation of mitigation measures to ensure safety and operational integrity.

Client:

Southeast Water (SEW)

Work Categories:

SC7, R1, R3